Building Information Modeling

Creating More-Accurate Construction Drawings

Innovation in construction and the use of cutting-edge technologies are integral to how Level 10 builds. We use the latest Building Information Modeling (BIM) software to produce dynamic models that provide total visibility and real-time information throughout planning and construction. BIM is one of the advanced planning tools that enable our Integrated Project Delivery process to increase construction efficiency, eliminate waste and improve quality. Using BIM, we can identify design conflicts early and realize significant cost savings by eliminating change orders in the field.

Level 10’s expert & experienced implementation of BIM can:

  • Provide teams with an accurate understanding of the design
  • Validate the design
  • Perform a reliable and in-depth feasibility review to help produce construction documents
  • Detect system clashes
  • Identify areas of conflict early in design
  • Identify more-efficient construction methods while maintaining design intent
  • Create virtual mock-ups
  • Plan field activities such as staging, material laydown, vehicle routing and logistics


This approach goes well beyond 3D models to provide:

  • 4D Time: Complete phasing and sequencing of the project
  • 5D Cost: Real-time estimating of project costs
  • 6D Life Cycle Management: Operations and management visibility for the life cycle of the building
Aerial view of a city at dusk featuring a prominent suspension bridge spanning the water. Skyscrapers, brought to life by California-based general contractor expertise, illuminate the foreground, while the evening sky gracefully shifts from orange to blue in the background.
Using BIM as a reliable and highly accurate source of information, Level 10 and our project partners are able to make smart decisions about projects very early in the design phase, which helps us keep tight control of budget, schedule and quality.

Leigh Askew

Director of MEP Services,
Level 10 Construction

Building Information Modeling Projects

Wakeland Housing and Development Corporation

Humble Heart

Creating affordable living options for people in the local community.

Chelsea Investment Corporation

Harrington Heights

15-story Harrington Heights, an Affordable Housing Project at 1320 Broadway will have 273 apartments

Meta

Meta MPK 22 Park

This new open space features a bike/pedestrian bridge for the community.

Meta

Meta SUN 102 Tenant Improvement

350,633 SF phased tenant improvement

City of Menlo Park

Belle Haven Community Center

38,000 SF, 2-story community center

City of San Diego

Torrey Pines Fire Station

New fire station in La Jolla.

Longfellow Real Estate Partners

Avia Labs

California’s First All-Electric Life Sciences Campus

OSIDE Arena Holdings

Frontwave Arena

170,000 SF Sports and Event Arena in Oceanside

SUBMIT YOUR RESUME

Please include your contact information and any related documents below to apply for the position below.