Building Information Modeling

Creating More-Accurate Construction Drawings

Innovation in construction and the use of cutting-edge technologies are integral to how Level 10 builds. We use the latest Building Information Modeling (BIM) software to produce dynamic models that provide total visibility and real-time information throughout planning and construction. BIM is one of the advanced planning tools that enable our Integrated Project Delivery process to increase construction efficiency, eliminate waste and improve quality. Using BIM, we can identify design conflicts early and realize significant cost savings by eliminating change orders in the field.

Level 10’s expert & experienced implementation of BIM can:

  • Provide teams with an accurate understanding of the design
  • Validate the design
  • Perform a reliable and in-depth feasibility review to help produce construction documents
  • Detect system clashes
  • Identify areas of conflict early in design
  • Identify more-efficient construction methods while maintaining design intent
  • Create virtual mock-ups
  • Plan field activities such as staging, material laydown, vehicle routing and logistics


This approach goes well beyond 3D models to provide:

  • 4D Time: Complete phasing and sequencing of the project
  • 5D Cost: Real-time estimating of project costs
  • 6D Life Cycle Management: Operations and management visibility for the life cycle of the building
Aerial view of a city at dusk featuring a prominent suspension bridge spanning the water. Skyscrapers, brought to life by California-based general contractor expertise, illuminate the foreground, while the evening sky gracefully shifts from orange to blue in the background.
Using BIM as a reliable and highly accurate source of information, Level 10 and our project partners are able to make smart decisions about projects very early in the design phase, which helps us keep tight control of budget, schedule and quality.

Leigh Askew

Director of MEP Services,
Level 10 Construction

Building Information Modeling Projects

Sugar Bowl Resort

Gondola Replacement

13,500 SF new gondola terminal and equipment at Sugar Bowl Resort.

Stanford Health Care

500 Broadway MOB, Parking Structure & Sitework

New 265,000 SF, 9 story, all-electric medical office building.

Ohana Real Estate Investors

Claremont Hotel Bayview Cafe

Renovation of 1,153 SF cafe facility in the historic Claremont Hotel.

City of San Jose

Emergency Interim Shelter Rue Ferrari Expansion

Expansion of Emergency Interim Housing by Highway 101 in San Jose, covering 90,233 SF

County of Santa Clara

Silver Creek Improvement Valley Health Plan HQ TI

Retrofit of existing building for new headquarters in San Jose for Valley Health Plan.

Jay Paul Company

Poppy & Claro – 50 West Restaurant

Full-service restaurant and bar TI in occupied high-rise.

San Diego Unified School District

Chesterton Elementary School Whole Site Rebuild

Five new K-5 educational buildings and administrative offices for Chesterton Elementary School.

City of San Diego

Fire Station 48

15,088 SF fire station for the City of San Diego.

SUBMIT YOUR RESUME

Please include your contact information and any related documents below to apply for the position below.