4,700 SF renovation of majority of Stauffer II Building 2nd floor into a new chemistry laboratory. The project included the construction of wet labs with sinks and fume hoods, a tissue culture room, instrument/equipment rooms, a conference room and faculty/student offices. A portion of the project was shelled for future build-out.
The project was completed in an occupied facility. Level 10 was able to maintain schedule despite the discovery of additional asbestos and hazardous materials that required professional removal.
Please include your contact information and any related documents below to apply for the position below.