South Bay Initiative Phase I

New 130,000 SF administration building and 100,000 SF engineering building and campus improvements.

Western Digital

San Jose

,

CA

New Administration Building, Engineering Building and campus improvements, including new signalized intersection.

Administration Building (Gensler): New ground-up, four-story building of approximately 130,000 SF The building includes a 15,000 SF customer briefing center, satellite café and interior workspace. A solar PV installation is located on the roof level.

Engineering Building (DGA Architects): New ground-up building of approximately 100,000 sq. ft. The building integrates dry labs and collaborative office space in a “Lean Lab” concept on both floors.

Campus Improvements: 233 locations were excavated using a soft-dig method to identify and locate existing utilities in order to relocate these utilities away from the new buildings while maintaining operations on the existing campus. Performing the relocation work as design-assist MEP allowed for fast-tracking this critical make-ready work, ensuring that HGST’s microelectronics manufacturing center would remain operational during construction.

Design-assist MEP. LEED Silver.

Project Information

Client

Western Digital

Location

San Jose
, CA

Level 10 Office

Market Sector(s)

Project Executive(s)

Architects(s)

DGA Architects & Gensler

Square Footage

230,000

Sustainability Certification

LEED® Silver

Related Services

Preconstruction

Design Assist/Design-Build MEP+

Building Information Modeling

Sustainability

LEED® Silver

Project Gallery

When $10 million of underground utility relocation work was unexpectedly added to the project at the last minute, Level 10 immediately staffed up as if the relocations were part of the original scope of work. They worked seven days a week through the holidays while also ensuring that our microelectronics manufacturing center remained operational during construction.

David Koury

Director, Design + Construction,
Western Digital

Related Projects

Meta

Meta MPK 21

New 524,000 SF, two-story headquarters with an expansive green roof.

Meta

Meta MPK 20

New 433,555 SF, two-story headquarters with a nine-acre green roof.