Core Value

A modern urban scene features two tall glass buildings under a clear sky, crafted by a California-based general contractor. Surrounded by trees, the bustling sidewalk and outdoor seating area in the foreground create a lively atmosphere.

Modern Steel Construction discusses SpeedCore, the revolutionary core erection process being used to build Level 1o’s 200 Park project in downtown San Jose. 200 Park, a 19-story high-rise, is the first project in California (and the 2nd in the U.S.) to use SpeedCore for building the structural core. SpeedCore replaces the traditional system of building a high-rise core (reinforced concrete)  with a “sandwich-type” system using prefabricated steel plates connected with welded tie bars and later filled with concrete. Read more by clicking on the link below.

Article Information

Article Type

In The News

Article Published

March 3, 2021

Article Source

Related Information

Market Sector(s)

Office(s)

Project(s)

SUBMIT YOUR RESUME

Please include your contact information and any related documents below to apply for the position below.